Product Performance
Lifetime Warranty
Diamond Pier® DP50

Pin Foundation’s, Inc’s Diamond Pier DP50 is a high technology foundation system designed to support decks, porches, walkways and stairs as outlined in ICC ESR-1895. All Diamond Pier DP50 products manufactured by Pin Foundations, Inc or its subsidiaries are in compliance with the design criteria, load requirements, specifications and details of the ESR product approval process.

Pin Foundations, Inc. warrants to the original property owner only, the performance of the Diamond Pier DP50 when properly handled and installed, according to the provided Manufacturer’s Installation Instructions and heaving soil recommendations, and when used in compliance with the ICC ESR-1895 requirements and stated capacity. Pin Foundations, Inc. warrants to the original property owner only, the published capacity and performance of the Diamond Pier DP50 for the life of the supported structure. Pin Foundations, Inc. will repair or replace, including materials and labor, any Diamond Pier DP50 that fails to perform when installed within the requirements and disclaimers defined herein. No other warranties are expressed or implied.

Requirements

  • The project must be installed according to the provided Manufacturer’s Installation Instructions and heave recommendations, and used in compliance with the design criteria, load requirements, specifications and details of the ESR product approval process.

  • The project must be registered with Pin Foundations, Inc. within 30 days of the project’s completion. The registration form may be downloaded here. The registration must include all the support documents and photos requested on the registration form.

  • The warranty is only valid once the project registration is approved by Pin Foundations, Inc. Pin Foundations, Inc. reserves the right to withhold approval for any use that does not meet the conditions set forth herein. The warranty process may be approved prior to the installation of the project, but such approval will be conditioned on the proper handling and installation of the Diamond Pier DP50, according to the Manufacturer’s Installation Instructions and heaving soil recommendations, and use in compliance with the ICC ESR-1895 requirements and stated capacity.

  • Pin Foundations, Inc. reserves the right to inspect the project at any time to insure proper installation and compliance, and to require that any repair or replacement of the Diamond Pier product be done by a contactor appointed by Pin Foundations, Inc. Pin Foundations, Inc. also reserves the right to replace any non-performing Diamond Pier DP50 with Pin Foundations, Inc. commercial version DP75 or DP100, if necessary.

  • This lifetime warranty is limited to the life of the original project and to the original property owner for which the Diamond Pier product was installed. This warranty is nontransferable to any new owner of said property, or to any future project or replacement structure erected on the original installed Diamond Piers.

  • Pin Foundations, Inc. reserves the right to use the project as a testament to the performance of the Diamond Pier products, use photos of said project for promotional purposes, and to use the Images depicting the Property in any Media, for the purpose of promoting the Diamond Pier products, which may include use in advertising, promotion, marketing and packaging. The property owner agrees that the images may be combined with other images, text and graphics and cropped, altered or modified. The property owner agrees that the property owner has no rights to the Images, and all rights to the Images belong to Pin Foundations, Inc. and/or Assigns.

Disclaimers

Pin Foundations, Inc. is not responsible for project failure if:

  1. the Diamond Pier DP50 has not been installed according to the provided Manufacturer’s Installation Instructions, or heaving soil recommendations, or used in compliance with the ICC ESR-1895 requirements or stated capacity.

  2. The cause of failure is due to related parts not supplied by Pin Foundations, Inc. Pin Foundations, Inc. supplies the Diamond Pier head, Pins, plugs and caps.

  3. The cause of failure is due to unique soil conditions that would require additional measures above and beyond what would typically be required in the jurisdiction. Such conditions may include but are not limited to soil compaction rates below 1500 psf, water retention areas, back filled areas, contaminated soils, soils not properly drained or consistent with those defined in the ESR-1895, and frost areas exceeding 48” frost depth.

  4. The cause of failure is due to Acts of God, such as a tornado, hurricane, flood, earthquake etc.

This warranty applies only to products that have not been misused, intentionally or unintentionally damaged, discontinued or outdated. This warranty does not cover cosmetic issues such as weathering, staining, pitting or general maintenance issues such as resetting of the pin heads and caps. Pin Foundations Inc. shall not be liable for any consequential or other damages, including injury to persons or property. No other warranties are expressed or implied.

 

 

 
 